Jump to content
C4 Forums | Control4

New install after house was completed


rolldog

Recommended Posts

I thought I would share a few pictures of my new install. I signed a purchase agreement to buy this house 3 months ago, closed on it 2 months ago, and it's almost ready to live in. Since the builder already had his plans and what he was planning to do, the real work didn't start until afterwards. Since all the permits had been filed, nothing could begin until after the closing, like tearing down a brick wall, running a 2 inch gas line for the pool heater and firepit, ripping apart the sheetrock for all the wiring from 3 racks full of equipment, etc. 

Front.jpg

Front entry.jpg

Outdoor kitchen.jpg

Outdoor Kitchen 2.jpg

Future Pool area.jpg

Kitchen.jpg

Living Room.jpg

Outdoor Kitchen3.jpg

Link to comment
Share on other sites


So far, total of 89 x Control4 Dimmers/Keypad Dimmers, 3 x in-wall touchscreens, 3 x T3 Series 7" table top touchscreens plus 8 x Control4 system remotes, 3 x Control4 thermostats, 1 x Control4 4K UHD 6 x 6 matrix, 5 x Qmotion roller shades, Glydea Drapery Track system, Control4 EA-5, 1 x Control4 16 channel audio matrix, 1 x Control4 8 Zone Amplifier, 3 x 55" Equipment Racks, plus too many other things to list now. 

20170718_000504.jpg

20170717_235800.jpg

20170627_193943.jpg

20170717_235049.jpg

20170717_233856.jpg

20170621_150801.jpg

20170621_153341.jpg

20170621_153420.jpg

20170717_234008.jpg

20170717_234034.jpg

20170627_193923.jpg

20170717_234022.jpg

20170717_233901.jpg

20170622_212542.jpg

20170718_000110.jpg

Link to comment
Share on other sites

  • 7 months later...

Archived

This topic is now archived and is closed to further replies.

×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.