Jump to content
C4 Forums | Control4

Arube

c4Forums Member
  • Posts

    1
  • Joined

  • Last visited

Recent Profile Visitors

The recent visitors block is disabled and is not being shown to other users.

Arube's Achievements

Newbie

Newbie (1/14)

0

Reputation

  1. Hi. Does this seem pricey?ONTROL SYSTEM UPGRADES/REPAIRS E-MAIL: arube1@optonline.net AGREEMENT OF SCOPE QUANTITY DESCRIPTION UNIT PRICE EXTENDED PRICE 1.0 1.0 1.0 1.0 1.0 1.0 CONTROL4 CONTROL & MUSIC SYSTEM: - Control4 EA-5 Entertainment and Automation Controller V2 (MSRP: $2400) - to replace HC800 - Control4 EA-1 Single-Zone AV Controller V2 (MSRP: $555) - to replace HC300 - Misc. Cables, Adapters, Connectors, etc. - LABOR: Installation, Programming & OS3 Upgrade of Above Listed Control4 Equipment OPTIONAL BUT RECOMMENDED NETWORK & POWER PROTECTION (not included in total): - AN 24-Port Gigabit Network Switch with Partial PoE+, Cloud Manageable (MSRP: $849) - WB 1500 VA UPS Battery Backup with Voltage Regulation (MSRP: $1149) - WB Power Conditioner with 12 IP Controlled Outlets, Cloud Manageable (MSRP: $799) - LABOR: Installation, Programming & Wire Cleanup for Above Listed Equipment CCTV UPGRADE: - HD IP Outdoor Turret Camera with Nightvision (wide angle lens) - ESTIMATED - LABOR: Installation, Programming & Aiming for Outdoor Camera ADDITIONAL LABOR (IF NEEDED): - LABOR: Hourly Diagnostics, Upgrades, Repairs, Programming (2 techs) NOTES: -- This proposal assumes all existing wires are in working condition -- This proposal assumes network is working and has adequate bandwidth for remote viewing -- This proposal does not guarrantee all remaining equipment is working/compatible 2250.00 495.00 100.00 1200.00 725.00 990.00 650.00 500.00 185.00 80.00 250.00 2250.00 495.00 100.00 1200.00 185.00 80.00 TERMS & NOTES: This agreement is for scope of work and equipment. Only the items and labor listed above are included in the price. Changes to the items listed above will change the total. PAYMENT SCHEDULE: Signature and deposit of 75% required upon hiring/ordering materials, parts or equipment; 25% is immediately due upon substantial completion of work detailed above. Training, warranty, repairs or service will not be provided until full balance is paid. The final invoice/receipt will reflect the items and pricing listed here. Prices may vary due to tariffs or material price increases. I, _____________________________________________ have carefully read and understand all of the line items, information, notes and terms listed above. I agree to the terms and to pay all of the charges listed here. As the property owner or owner's agent, I agree to accept the responsibility of satisfying the balance. Signed by: _______________________________________________________ Date: _____________________ SUB-TOTAL: TAX (8.625%): DEPOSIT PAID: TOTAL: 4310.00
×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.