AdamT Posted January 17, 2014 Share Posted January 17, 2014 Here is an interesting question. I have someone with a 1000 and it is flaky. I know many of you know much more than i do so i am looking for simple migration procedure to make the most of my time.I know you can migrate zigbee if you are on os 2.5 but here is the difficult part.He has an HC-1000, Main controller - ZAP ServerHe has two HC-300b's with one being the ZAP CoordinatorHe has eight HC-200'sAll running 2.2.xThe issue is we are swapping the 1000 for an 800. With that being the zigbee server what order would you use to swap to the 800 efficiently? Upgrade 1000, backup, send project to 800, plug into network and upgrade other controllers and then zigbee?Once your on 2.5 with the 1000 you just stop zigbee server, and start it on 800 and then go right? Both controllers on network at same time? One at a time? Want to make sure (if I can) I dont have to leave mesh and rejoin with all zigbee devices. Oh and that's because there are 101 V2 switches/dimmers, 58 Keypads V2, something like 15 remotes, 5 thermos and so on......Anyone have the best process without recommending that someone else do it??!!??Thanks in advance.AEdit-fixed my grammar error. Link to comment Share on other sites More sharing options...
dogdvr Posted January 17, 2014 Share Posted January 17, 2014 Have you looked at the knowledge base article on this? It is pretty well done, IMHO Brent Link to comment Share on other sites More sharing options...
AdamT Posted January 18, 2014 Author Share Posted January 18, 2014 BrentI have but......Just looking for real world advice. KB's are always good but I also like to hear about the real world side. Thx Link to comment Share on other sites More sharing options...
Cyknight Posted January 18, 2014 Share Posted January 18, 2014 ZigBee server has ALWAYS been exchangeable w/o issue, what you're looking for is the ZAPCo switch.Personal easiest in you sistuation if licensing etc allows is to just add the 800 to the system, update it all, move over zserver and zapco. Once done, back-up, clear and load project on 800, remove 1000, re-register and off you go. Link to comment Share on other sites More sharing options...
AdamT Posted January 18, 2014 Author Share Posted January 18, 2014 CyThanks! This helps with the exception of needing an 8000:). Kidding. Never punch a gift horse in the mount. Will let you know how it goes. A Link to comment Share on other sites More sharing options...
Cyknight Posted January 18, 2014 Share Posted January 18, 2014 LOL - fixed, now you fix your 10000 in the original post Link to comment Share on other sites More sharing options...
Godzilla Posted January 19, 2014 Share Posted January 19, 2014 it actually started in version 2.2 or higher i believe, for the simplified process of moving director to another controller, and the updated migration process Link to comment Share on other sites More sharing options...
Cyknight Posted January 19, 2014 Share Posted January 19, 2014 It's there in 2.0.6 at least for zserver, zapco wasn't until 2.5 Link to comment Share on other sites More sharing options...
Godzilla Posted January 19, 2014 Share Posted January 19, 2014 Yep on the zap coordinator 2.2 pretty sure in migrating to another controller Link to comment Share on other sites More sharing options...
AdamT Posted January 19, 2014 Author Share Posted January 19, 2014 LOL - fixed, now you fix your 10000 in the original post Crap, didn't notice mine......good call. Link to comment Share on other sites More sharing options...
Cyknight Posted January 19, 2014 Share Posted January 19, 2014 Yep on the zap coordinator2.2 pretty sure in migrating to another controller Pretty sure it was there even in 1.8.2 actually - I KNOW it's there in 2.0.6 as I just did this last week. Link to comment Share on other sites More sharing options...
Recommended Posts
Archived
This topic is now archived and is closed to further replies.