Jump to content
C4 Forums | Control4

My DIY Rack


thinslis

Recommended Posts

This is my DIY rack. From bottom to top: Panamax Power conditioner, DirecTV DVR x2, HC300C, 4 zone AMP. Network shelf: D-Link 24 port Gig switch, Linksys Router, ZOOM cable modem, POE Injector for Netgear WAP, 48 port Black Box Patch pannel.

Rack2.jpg

Rack3.jpg

Rack4.jpg

Rack1.jpg

Link to comment
Share on other sites


Thanks. I'm thinking down the road my dealer is going to have to consolidate equipment to accomodate future growth. I'm thinking the two DVRs could be stacked on one shelf ect. My future equipment list includes: Video matrix switch, Home Theater reciever, Some type of Blue Ray player or Media server. We'll just see where we get with what I've got so far =)

Link to comment
Share on other sites

Yeah, that was the only thing I was thinking is what to do when more equipment comes along. You could probably compress the shelves to make room for a few more. How about cooling? I assume that staircase will be enclosed at some point in the future??

Link to comment
Share on other sites

@Controlfouruserguy - Yes we have plans to finish off the basement in the future. At that point the stairs will be drywalled and a door installed. At that time I'll be looking at installing vents top and bottom and probably some fans to draw in cool air from the floor vent.

@Henniae - Do you bolt the shelf to bracket on those? I thought the shelves just set on top of the brackets?

Link to comment
Share on other sites

@henniae - I'll have to look at that for the next phase. I don't want to do a rip and replace without a current need.

@jwhitaker@revit - I wanted to go with a 72u Rack I really did, but it just wasn't in my budget. Once the basement is finished no one is going to see any of this anyways...

Link to comment
Share on other sites

^Actually, after people who tour my house relieve themselves of the ususaul obligatory compliments, I take them down to see the equipment room and the racks. That is generally when people begin to "relieve" themselves in the true sense.

Sometimes a picture is worth more than verbal description :) Show us your rack!

Link to comment
Share on other sites

@dogdvr - Not a chance. I actually goofed and forgot to predrill the holes in the shelves before I mounted them. Most of the holes were fine but a few of them I really needed to lay into the drill to get it to finish. Must have been the hot drill bit and MDF board or something but it didn't want to cut anymore. Now I go 230lbs and I was putting all my weight into the drill and finally the one hole ripped through... the bracket was just barely bent out of level. So I would say no, there is no way those shelves are going to "fall off". Each board has 3 screws into each bracket and each bracket has 3 into the studs.

I wouldn't even hesitate to put a full UPS on one of them.

@IloveC4 - I can't take credit for the actual running of the cables, my dealer did that, however I did run all the lines that go to the patch pannel and I told the dealer how I wanted all his cables to run. So my design, he did the labor. (Notice how the lines come down from over your head and hug the bottom of the stairs then cross over at the landing, that was done to preserve excess cable in case I do buy a real 72u Rack some day)

Link to comment
Share on other sites

Nice job overall.

One thing I would have recommended you had done is to cover the wall with 3/4 inch plywood (not MDF). This would give you a place to screw miscellaneous stuff to the wall. I use plywood because MDF is a bit too fragile when you use small screws.

Also leave a large service loop of cable. It looks like you did this.

Link to comment
Share on other sites

@henniae - Thank you, I lost a lot of sleep trying to come up with the best design with a limited budget (for the rack).

As for covering the wall with 3/4 plywood I don't see the need to do thise. Right now I can nail 2x10 between the studs on a as needed basis (left over scraps from constructions so zero cost). Leaving the stud cavity's open gives me the ability to run power lines down through the back of the shelf rather then down the same holes with the AV / Network cables. Plus it will be easier to work with when I go to run power for the outlets / lights when I start finishing the basment.

Link to comment
Share on other sites

@getafix - Correct, our office desk was damaged when they delivered it so right now the only thing patched in is my temporary jack for my PC. Also I only intend to patch in jacks that are going to be used. So mostly Office, Living room, Master bedroom. The rest are for future use... IE: if we allow the kids to have computers in their rooms (Not likely though =) ).

Link to comment
Share on other sites

The one thing I would suggest is to properly sheetrock around the stairs before you put anything serious under there.

In our jurisdiction, it's required for firestopping. 5/8" sheetrock, I believe. Putting equipment under the stairs without some sheetrock isn't a great idea, imho.

RyanE

Link to comment
Share on other sites

The one thing I would suggest is to properly sheetrock around the stairs before you put anything serious under there.

In our jurisdiction, it's required for firestopping. 5/8" sheetrock, I believe. Putting equipment under the stairs without some sheetrock isn't a great idea, imho.

RyanE

I'll look into it. But I don't see how this is any different from having a work shop in an unfinished basement, you still have equipment plugged into wall outlets and uncovered studs...

Link to comment
Share on other sites

I know, I'm just saying that for Fire Protection here, in Utah, they make you cover up the underside of the stairs.

Obviously he has his occupancy permit, and obviously it isn't required there. Still a good idea IMO. Stairs are obviously a critical part of exit strategy in a multilevel home.

Link to comment
Share on other sites

Archived

This topic is now archived and is closed to further replies.

×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.