On 1/30/2018 at 4:23 PM, sonic30101 said:

My 1st floor is all GE zwave dimmers and a vera controller. They work fine, just can't play with ramp rates and lose double and triple tap programming but they will interface with c4 just fine

I am considering GE zwave dimmers as an option to integrate with C4. I am still interested in Lutron Casseta for their Picos but debating if GEs are reliable enough instead of C4 dimmers and switches. Is vera all local and will work with internet connectivity? Any advice is appreciated.

Link to comment
Share on other sites

6 hours ago, aag said:

I am considering GE zwave dimmers as an option to integrate with C4. I am still interested in Lutron Casseta for their Picos but debating if GEs are reliable enough instead of C4 dimmers and switches. Is vera all local and will work with internet connectivity? Any advice is appreciated.

I can’t answer all of your questions, but I can tell you that I’m in construction on a new home right now and after doing a bunch of research and considering all my options I went with Control4 lighting. 

Link to comment
Share on other sites

5 hours ago, ILoveC4 said:

I can’t answer all of your questions, but I can tell you that I’m in construction on a new home right now and after doing a bunch of research and considering all my options I went with Control4 lighting. 

Same. I did go w panelized however for cleaner look. We’ll have a few rooms with lots of different lights etc.

Link to comment
Share on other sites

2 hours ago, Neo1738 said:

Same. I did go w panelized however for cleaner look. We’ll have a few rooms with lots of different lights etc.

I almost did that, but ultimately decided against it because I wanted standard wiring for whatever the future may hold. There are a few places where I have more switches than I’d like. 

Link to comment
Share on other sites

7 hours ago, ILoveC4 said:

I almost did that, but ultimately decided against it because I wanted standard wiring for whatever the future may hold. There are a few places where I have more switches than I’d like. 

Yeah was a tough decision. Ultimately we plan to be in the house at least 20 years by then will need remodel so we can change if needed at that time.

Link to comment
Share on other sites

This thread is quite old. Please consider starting a new thread rather than reviving this one.

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.